Highlights:
-
1st Wave Language Editions (other than English)
- Europe Hub
- Ship info: the MSC MICHIGAN VII has already set sail from Ningbo
- January 8 estimated date the ship will dock at Gdynia.
- Canada
- January 18 expected to arrive in Toronto
- No ship tracking at this time
- Europe Hub
-
2nd Wave English (including single shipment pledges)
- Europe Hub
- Containers are on two different ships
- January 8 expect the MSC MICHIGAN VII to dock at Gdynia
- January 15 expect the MSC BENEDETTA XIII to dock at Gdynia
- USA Hub#1 West (Gamerati)
- 1st batch: en route on the CMA CGM MUNDRA, with an ETA in Seattle of December 17th
- 2nd batch: left China and is scheduled for transshipment in Busan, with an ETA in Seattle of January 4th
- 3rd batch: booked for departure on December 18th, with an ETA in Seattle of January 8th
- 4th and 5th batches: awaiting the final confirmation of the reservation for the last two containers, with a planned departure on December 29th and an ETA in Seattle on January 14th
- USA Hub#2 East (QML)
- All containers are currently at sea on the GSL VIOLETTA, with an ETA in Miami of January 15th
- UK Hub
- 1st container: expected to arrive in Felixstowe on December 30th (OOCL FELIXSTOWE)
- 2nd container: scheduled to depart on December 14th (MSC ALLEGRA) with an ETA in Felixstowe of January 17th
- Australia Hub
- containers are on the EVER UNICORN, with an ETA in Melbourne of December 25th
- Canada Hub
- 1st batch: have been collected and are expected to have a preliminary ETA in Toronto of January 18th
- 2nd batch: estimated departure December 22
- Asia Hub (VFI)
- Pick-up from the factory is scheduled to start this week
- Europe Hub
Leave a Polite Comment